Waterrail Roofing Services
Gutter Refurbishment
HOME OTHER SERVICES ABOUT US Main website CONTACT US
Contact us now on 07795 972 663
The following project details work undertaken by Waterrail for Chemical re-processing plant, Southampton
60 Linear Metres of failed eaves gutter relined
CUSTOMER : Chemical re-processing plant
CATEGORY : Gutter Refurbishment Services
60 Linear Metres of failed eaves gutter relined with H.G Sharman Ltd Rubberised plygene gutterline system.
Because the existing galvanised steel gutter was badly rusted we inserted a new galvanised steel break pressed former to match the existing profile. This was fixed into the sides to create a new level sole to prevent ponding and puncture. 8no. outlets and 2no. stop ends and 2no. weir overflows were heat welded to the liner to create a joint and detail free gutter. Because the sole of the gutter was 600mm wide and the sites high exposure location holding down straps were also fixed at 2.0m centre to prevent wind uplifting the liner.
BEFORE
AFTER
Project Images
 
Waterrail Brochure
Download Waterrails brochure for printing off! Just click here.
Waterrail Brochure
© Waterrail Roofing Services 2008